WE Report

Lessons Learned

Lesson Learned





By: Karina Helle

Report No.

1219

Discipline/Origin

Drilling
Experience Transfer Meeting

Well

Oselvar
A-1 H, A-2 H, A-3 HT2

Date created

2012/03/25
5005 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Other
Negative

Borgland Dolphin


What happened in Production section:
DONG handover documentation: When running in with the seal assembly on MUT, the bullnose on the pipe below was standing up in the wellhead. Several attempts were made and pipe pulled over to be able to pass. Doing this with seal assembly in the hole was troublesome and risky.

External Actions

In future run one more stand below MUT, so bullnose is stabbed into casing before picking up seal assembly, this gives much less concern about what is hanging up and more freedom to move string to stab in.

EDITOR


CLOSE LL (testing)





New Lesson Learned

You do not have permission to view this form.




\n\t\t